Following up on the discussion of potential emissions from a power plant in the Valley, today I wanted to think about some different supporting infrastructure that will need to be constructed. The starting point for this analysis is Homeland Renewable Energy’s website, Fibrowatt’s parent company, specifically the technical data sheet about the Minnesota plant, which is the first reference link at the end of the post.
There are two points to call out specifically, both of which will require specialized infrastructure: (1) the stack height of 300 feet, and (2) the voltage that power generated at the plant is delivered to the grid – 115kV.
Starting with the stack height, it’s hard to get a perspective on how tall 300 feet is in Page County, since the Valley is surrounded by two mountain ridges. The nearby peaks in Shenandoah National Park, notably Stonyman and Hawksbill, are 4,000 feet tall. Two easily identifiable peaks in the shorter Masssanutten ridge are Kennedy peak and Duncan Knob, at between 2,500 and 2,800 feet tall.
There are numerous photographs of panaoramic views from these summits on the Hiking Upward site (www.hikingupward.com) or from Google Earth. From those heights, tall constructed objects are visible, but for the time being there are none over 150 feet tall, these being cell towers. As I drove through Luray last weekend I made a mental inventory or a few of them – the Tannery stack, at about 50 feet, the Luray Caverns Bell Tower, also about 50 feet tall, the cell tower on the ridge above downtown about 100 feet, and the tower near Wal-Mart, about 120 feet tall. There are also water towers in Luray and Stanley, both of which are well below 100 feet.
Three hundred feet is pretty hard to quantify in Page County, because there is simply nothing that tall here – roughly equivalent to a 30 story building. This stack is five or six times as tall as the tannery stack, and nearly three times as tall as the tower near Wal-Mart. A smoke stack of that height would immediately draw attention from all of the panoramic vistas along the Shenandoah National Park ridge, including several of the historic overlooks on Skyline Drive. Hikers on the Appalachian Trail, when they are on the west side of the ridge, would see it from a few miles south of Big Meadow all the way up to the Rileyville area, perhaps as far as Compton Peak – four or five hiking days.
Down to earth, in the Valley, this smokestack would easily be visible from the Luray Caverns parking lot, where 500,000 tourists a year would take in the view. And families and kids at the Hawksbill Recreation Center in Stanley, which is very close to the proposed location at Project Clover, would also have a very clear perspective on the stack. The bike crowd in for state qualifiers – about a thousand of them, would see the stack from all along their route, and it would surely be a topic of conversation for the thousand-plus tri-athletes in June and August, putting an end to these emergent tourist activities.
The second infrastructure issue that draws my attention is the electrical transmission equipment that will be required. The voltage that will be delivered to the grid – 115kV, is considered high voltage and will require high voltage transmission lines. The Valley already has a few of these – but none running through the center area at Project Clover.
A Google search for pictures of high voltage towers to me to a Minnesota state permitting site, which is linked below. There are photos with a couple of examples like this one, and there are some images of big open country towers in the Wikipedia article cited in the references. A string of these (smaller ones!) will be needed to transmit the power to the national grid and to the end customer – a quick note here that that customer could be anywhere in the United States that is connected to Fibrowatt’s entry grid.

As indicated by this simple graphic from the Department of Energy (also found on Wikipedia), there will also need to be a substation, or transformer, built in proximity or on the grounds of the power plant. There's a photograph of a typical transformer station below. While altitude won’t be significant here, the necessary towers will begin from there, radiating out through the Valley. I suspect that the transmission line will impact the Massanutten Ridge in some form, as I doubt that clearing space for this construction would be allowed in the Park. On the other hand, there are lines in Thornton Gap, so this may be the point of entry for the power to the grid.

In the research I’ve been doing, I have tried to keep an open mind to Fibrowatt and the opportunity to have a biomass plant in Page Valley. The proposed location, as I understand it, at Project Clover is my major point of concern. It is dead center in the Valley with prevailing winds to the northeast and southwest, which means any emission particulate matter will fall on the neighboring towns of Stanley and Luray. The height of the building and smokestack will be visible from throughout the Valley, including prime tourist attractions.
I’ve always been against the use of the Project Clover land for any industrial use, but I am against it even more when that use will require obtrusive construction such as this. If the plant were to come to the Valley in a location with less impact, I might support it – but since the Page County EDA has pushed this site into consideration, I have to make a stand against it.
At this point, I’ve done enough research on Fibrowatt to have an opinion. I foresee devastating economic impacts to the tourism and agriculture industries in the Valley, and the potential for significant environmental degradation. To put it simply: I’d rather not see a plant here.